A 300 mm feed at 60 SPM has 0.389 seconds of crank window and needs 0.317 seconds of motion plus 30 milliseconds of settle. The article builds the budget from the cam angles, gives the SPM ceiling for five feed lengths, and explains why acceleration, strip condition and camber move the answer.

How Much Cycle Time Does a 300 mm Feed Take?

A 300 mm feed at 60 SPM has to happen inside a window of about 0.39 seconds, and that window is set by the press, not by the servo feeder.

Most feed problems on a progressive die are not accuracy problems. They are timing problems, where the feed finishes late and the pilot pins arrive before the strip has settled.

The arithmetic below takes one job through the whole budget: 300 mm pitch, 60 SPM, a 400 kg carriage and a 140 degree feed window.

The Stroke Budget a Servo Feeder Has to Fit Into

At 60 SPM the press completes one cycle in exactly 1.0 second. Every operation on the line has to fit inside that second, including the feed.

The feed can only run while the pilot pins are clear of the strip. On this die the pilots enter at 70 degrees of crank angle and withdraw at 290 degrees.

That leaves 140 degrees of crank travel for the feed, which at 60 SPM is 0.389 seconds. The servo feeder gets 389 milliseconds to accelerate, move 300 mm, decelerate and settle.

Settle is not optional. The strip has to be stationary before the pilots enter, and 30 milliseconds is the usual allowance for a carriage to stop ringing.

So the real motion budget is 0.359 seconds. Everything after this point is about whether the machine can use it.

The 140 degree figure comes from the die, and it is worth measuring rather than copying. A die with early pilot entry, or one fitted with a die protection sensor on the strip, closes that window quickly.

Tooling drawings usually state pilot release timing in crank degrees. When they do not, mark the crank at pilot entry and read the angle with a protractor on a stopped press.

Whatever the drawing says, subtract the settle time before comparing with a motion calculation. A feed that finishes at 0.36 seconds in a 0.389 second window looks fine until the carriage is still moving at 0.37.

Motion Arithmetic for a 300 mm Feed

A feed move is a trapezoid: accelerate, cruise, decelerate. The time depends on peak acceleration and peak velocity, and the two trade against each other.

Take 12 m/s² and a peak of 1.8 m/s. Acceleration takes 0.15 seconds and covers 135 mm. Deceleration mirrors it, so 270 mm of the 300 mm is gone in 0.30 seconds.

The remaining 30 mm runs at 1.8 m/s and takes 0.0167 seconds. Total motion time is 0.317 seconds, which leaves 0.042 seconds inside the 0.359 second budget.

That margin is thin but real. Raise the feed to 90 SPM and the window shrinks to 0.259 seconds while the move still needs 0.317, so the feed cannot finish in time.

Solving for the speed at which the move exactly fills the window gives about 67 SPM on this die. That is the ceiling, and it is a property of the pitch and the crank, not of the motor.

Press speedCycle timeFeed window at 140 degreesTime the 300 mm move needsWhere the limit sits
40 SPM1.50 s0.583 s0.347 s with settleComfortable, 236 ms spare
60 SPM1.00 s0.389 s0.347 s with settleFits, 42 ms margin
75 SPM0.80 s0.311 s0.347 s with settle36 ms short, pilots arrive early
90 SPM0.67 s0.259 s0.347 s with settle88 ms short, feed is the bottleneck

How the Pitch Sets the Ceiling

Feed time grows with the square root of the feed length when the move is triangular, so doubling the pitch does not double the time.

That is why a 300 mm die runs near 67 SPM while a 100 mm die on the same machine reaches 110 SPM without any hardware change.

Feed lengthFastest move at 12 m/s²Plus 30 ms settlePress ceiling on a 140 degree window
100 mm0.183 s0.213 s110 SPM
200 mm0.258 s0.288 s81 SPM
300 mm0.316 s0.346 s67 SPM
500 mm0.408 s0.438 s53 SPM
800 mm0.516 s0.546 s43 SPM

Read the table as a purchase tool. If the die needs 500 mm of pitch and the press is specified at 60 SPM, the line will not reach 60 SPM whatever the motor nameplate says.

The same table explains why a long-pitch die that runs at 40 SPM in the quotation often runs at 38 in production. The 2 SPM lost are the settle time nobody budgeted.

A 500 mm Die on the Same Press

Move the same machine to a 500 mm pitch die and the ceiling falls from 67 to 53 SPM. The press is unchanged, the drive is unchanged, and the output drops by a fifth.

The window at 53 SPM is 0.440 seconds, and the move needs 0.408 seconds plus 0.030 of settle. At 60 SPM the window is 0.389 and the move would overrun it by 49 milliseconds.

That overrun is what a late feed looks like: the pilot pins enter against a strip that is still moving, and the die takes the load. The damage is usually a bent pilot, occasionally a cracked insert.

Two ways out exist. Reduce the settle allowance by stiffening the carriage, which buys 10 to 15 milliseconds. Or raise peak acceleration, which costs torque and gearbox life.

Neither recovers the full 14 SPM. A 500 mm pitch on a 60 SPM press needs a longer window from the die, and that is a tooling decision rather than a machine decision.

Acceleration Is the Number That Actually Binds

Peak velocity is easy to quote. Acceleration is what the carriage, the rolls and the strip have to survive.

For a pure triangular move the required acceleration is 4L divided by the square of the time. Three hundred millimetres in 0.359 seconds needs 9.3 m/s².

Acceleration costs force: 400 kg of carriage at 9.3 m/s² is 3.7 kN, plus about 310 N of friction. Through a 60 mm pinion that is roughly 240 Nm at the motor, before gearbox losses.

Drop the machine to 8 m/s² and the same move needs 0.417 seconds, which caps the press at 56 SPM. Two points of acceleration are worth eleven strokes a minute on this job.

This is where a light carriage pays. Reducing moving mass from 400 kg to 300 kg cuts the torque demand by a quarter and lets the drive use the extra headroom for acceleration.

It is also where a cheap gearbox shows up. A unit rated for the static load but not for the reversing torque will lose position at the end of the move.

That error appears as a short feed rather than as a fault code, which is why it takes a strip measurement to find.

NC servo feeder carriage and rolls measured for cycle time at a 300 mm feed

When the Arithmetic Stops Being True

Every number above assumes the rolls grip, the strip is flat and the pilot timing is what the cam drawing says. Four conditions break that assumption.

Thin or oiled strip is the first. Below about 0.4 mm with a heavy oil film, the rolls slip during acceleration and the feed takes longer than the motion profile predicts.

Perforated and louvred strip is the second. A roll that drops into a hole changes its effective radius for part of a revolution, and the feed loses a few tenths of a millimetre at exactly the wrong moment.

The third is the press itself. Link-motion and servo presses do not hold a constant crank velocity, so a 140 degree window at 60 SPM average can be 120 degrees at the point the feed needs it.

The fourth is a weld seam or a coil end. The thickness step changes the grip and the strip can shift, which shows up as a single bad part every coil rather than as a cycle time problem.

Camber is a fifth, and it is the one that costs the most time in practice. A strip with 3 mm of camber over 2 m will not track straight at speed, and the feed has to slow down to keep the edge in the guides.

On a 300 mm pitch that slowdown is often 10 to 15 percent of the ceiling, which is why the same machine runs a different rate on a different coil.

Thickness tolerance is the sixth. A strip running 0.05 mm heavy across the coil changes the roll gap and the grip, and the feed length drifts by a few hundredths of a millimetre over a shift.

None of these are visible in a motion calculation, and all of them are visible in a trace. That is the reason to measure rather than to trust the arithmetic once the die is in the press.

What to Measure on the Line Instead of Calculating

  • Servo command against encoder feedback, captured on a scope over 20 strokes
  • Time from feed start to in-position bit, compared with the cam window
  • Pilot mark position on the strip, which shows whether the strip moved after the feed stopped
  • Peak torque from the drive log, which is the fastest way to see a carriage binding
  • Stopwatch over 100 strokes as a sanity check on the press counter

Timing and position are separate contributions in the full error budget from decoiler to die, which the coil line guide library treats side by side.

FANTY builds servo feeding equipment to plus or minus 0.05 mm at 200 SPM, and the plants that reach that figure are the ones that check the cam window before they blame the machine.

Model ratings, roll widths and carriage masses sit in the servo feeder data sheets, which is where a cycle time claim can be checked against a real machine rather than a brochure.

What is the shortest time a servo feeder needs for a 300 mm feed?

About 0.32 seconds of motion at 12 m/s², or 0.35 seconds including settle. That is the floor for a 400 kg carriage with a 60 mm pinion.

At what SPM does a 300 mm feed become the bottleneck?

Around 67 SPM on a 140 degree window. Below that the press sets the rate, above it the feed does.

How much acceleration does a 300 mm move need in 0.36 seconds?

About 9.3 m/s² for a triangular profile. At 8 m/s² the same move needs 0.42 seconds and the ceiling falls to 56 SPM.

Does doubling the pitch halve the maximum press speed?

No. Time scales with the square root of length, so 600 mm takes about 1.41 times as long as 300 mm, not twice.

How much settle time should be allowed after the feed stops?

30 to 50 milliseconds. Under 30 ms the pilot pins can enter while the carriage is still ringing, and the die sees a shifted strip.

Can a 5 kW drive move a 400 kg carriage at 12 m/s²?

Yes, at about 240 Nm peak through a 60 mm pinion, which is inside the continuous rating of a 5 kW servo for a 0.32 second move.

Where to go next

Cycle time is the limit that decides whether a line reaches the rate in its quotation, and it is the easiest one to calculate before the machine is ordered.

Our coil line knowledge base sets out the full error budget from decoiler to die, including the timing contribution this article leaves out.

Read the feed accuracy pillar