What Coil Width Cuts Best From a 1,250 mm Master Coil?

What Coil Width Cuts Best From a 1,250 mm Master Coil?

Summary

A 382 mm strip running three across a 1,250 mm master recovers 91.7 percent of the steel, against 61 percent for two across. The article builds the arithmetic from the die window, prices a point of yield in dollars, and sets out where the number stops being useful.

What Coil Width Cuts Best From a 1,250 mm Master Coil?

Three strips of 382 mm from a 1,250 mm master coil leave 51 mm of trim per edge and recover 91.7 percent of the material you paid for.

Two strips of the same width recover 61 percent and look cheaper on the slitting quote, because the quote counts cuts and not kilos.

The difference on a 5 t coil is 1,540 USD of steel. The arithmetic that produces it takes four numbers.

Start From the Die Window, Not From the Coil

The die sets the strip width before the coil does. A progressive die with two rows of pilots and a 12 mm edge margin has a minimum strip width, and it has a maximum one as well.

Go narrower than the minimum and the pilots run off the strip edge. Go wider and the strip will not enter the guides, or it enters with the pilots striking outside the stock.

On the bracket die in this example the window is 375 to 390 mm. That single number decides everything that follows, because it rules out widths the coil could otherwise supply.

Measure it rather than reading it off a drawing. The die that arrives on the floor is often 2 to 3 mm wider than the one in the file, after a repair or a re-ground punch.

Once the window is fixed, the question becomes how many strips of that width fit across the master coil with a workable edge left on each side.

The Three-Width Arithmetic on a 1,250 mm Master

Assume a 382 mm strip, a slitter kerf of 0.4 mm per cut, and a minimum edge trim of 10 mm per side for burr and camber.

Three strips need 1,146 mm of strip plus 0.8 mm of kerf, which leaves 103 mm split between two edges. That passes the trim rule with room to spare.

Two strips need 764 mm and leave 486 mm, which is not a width plan at all unless the leftover is stocked for another part number.

The interesting case is the mixed plan: two strips of 382 mm and one of 460 mm for a second part. That uses 1,224.8 mm and leaves 12.6 mm per edge.

Twelve millimetres is inside the trim rule and outside the comfortable range. A coil with 3 mm of camber will pull the narrow edge trim down to 9 mm on one side, and the slitter burr then reaches the strip edge.

Width planWidth usedTrim per edgeWhere it costs you
3 x 382 mm, one part number1,146.8 mm51 mm91.7 percent yield, and 103 mm of scrap per coil to handle
2 x 382 mm, one part number764.8 mm242 mm61 percent yield unless the 480 mm remainder is a stocked width
2 x 382 + 1 x 460 mm, two part numbers1,224.8 mm12.6 mm97.9 percent yield, paid for in scheduling and a coil-end changeover
1 x 382 mm, one part number382.8 mm433 mmOnly sane when the master coil is bought for this part alone

The last row is not a joke. Plants that buy a 1,250 mm master because it is a stock size, and then run one narrow part from it, are paying for 69 percent scrap and calling it convenience.

If the coil is bought for one part, buy it at the width the part needs. Slitting to 400 mm at the mill costs 15 to 25 USD per tonne and removes the whole argument.

Trim, Kerf and Camber: The Allowance That Eats the Gain

The 10 mm trim rule is not a safety margin invented by slitter makers. It comes from what a slitting line does to an edge.

A slitter cut leaves a burr of 0.03 to 0.08 mm on one side and a work-hardened band 0.2 to 0.5 mm wide. Below 10 mm of trim, the burr from the outer cut lands within the strip that goes to the die.

Camber is the second allowance. A coil with 3 mm of camber over 2 m will walk sideways in the guides, and the edge that was 51 mm wide at the slitter is 40 mm by the time it reaches the die.

Keep the trim at 15 mm per edge where camber is unknown, and 10 mm where the coil is certified straight. The 10 mm saved is worth less than one jammed strip at 180 strokes per minute.

Kerf is small but not zero. At 0.4 mm per cut and three cuts, 1.2 mm of the master width disappears before any strip exists.

Crown is the allowance nobody writes down. A master coil with 1 percent crown is 12 micrometres thicker at the centre than at the edge, and the die feels that as a gap change across the width.

What a Point of Yield Is Worth in Dollars

Take a 5 t coil of 1.2 mm SPCC at 780 USD per tonne. The coil costs 3,900 USD and carries 425 m of strip.

With a 420 mm feed pitch and three strips running in parallel, the coil yields about 3,030 parts. Material cost per part is 1.29 USD before any scrap credit.

The 103 mm of edge trim weighs 415 kg and sells as scrap at roughly 300 USD per tonne, which returns 124 USD, or 4 cents per part.

Move to the mixed 12.6 mm trim plan and the scrap falls to 51 kg. The credit drops to 15 USD, but 364 kg of steel that used to be scrap is now product.

That is the point people miss: the scrap credit is not a recovery. It returns 38 cents on the dollar, so every kilogram turned into trim costs 48 cents net.

On 3,000 parts a day, two shifts, the 30-point yield gap between the three-strip and two-strip plans is worth about 1,150 USD per day of running.

Plan on a 5 t coilParts per coilMaterial per partScrap creditWhere it costs you
3 x 382 mm3,0341.29 USD124 USD103 mm of trim to collect and bale on every coil
2 x 382 mm2,0221.93 USD583 USD1,540 USD of extra steel per coil for the same output
2 x 382 + 1 x 460 mm2,022 plus 1,0111.22 USD15 USDTwo part numbers on one coil and a stop at every coil end
Slit steel coil strip stacked beside a coil line awaiting a width change

Where the Yield Number Stops Being Useful

A 97.9 percent width yield looks like the answer until you cost the changeover it requires.

The mixed plan puts two part numbers on one coil. When the 460 mm strip runs out, the operator stops, cuts the remaining 382 mm strips free and re-threads. That is 25 to 40 minutes, and it happens at every coil end.

At 12 coils a week the mixed plan spends 6 to 8 hours a week on changeovers. If the press earns 180 USD an hour in contribution, the saving of 1,150 USD a day can disappear in a fortnight of low-volume running.

The arithmetic also assumes the master coil is available at 1,250 mm.

Much of the spot market ships 1,219 mm, which drops the three-strip plan to 1,146.8 mm used and 36 mm of trim, and the mixed plan to 1,224.8 mm used and minus 3 mm, which does not exist.

It assumes the strip stays flat, too. A coil with 1 percent crown and 3 mm of camber will not hold 12 mm of trim through a 400 m run, whatever the drawing says.

Last, yield says nothing about the bottleneck. If the press is the constraint, a plan that adds a coil-end stop is worse than one that wastes 8 percent of the steel.

Choosing a Width for a Part Family

The right question is not what width one part needs. It is what set of widths covers the parts the plant will run for the next two years.

List every part by strip width, then sort by annual volume. The top four widths usually cover 70 to 80 percent of the tonnage, and those four decide the master coil size.

If two widths sum to within 40 mm of the master, pair them. If they sum to within 15 mm, do not, because the trim allowance will not survive a cambered coil.

  • Die window confirmed on the tool, not on the drawing, before any width is quoted
  • Master width available from the mill at 1,250 or 1,219 mm, confirmed in writing
  • Trim of 10 mm per edge minimum, 15 mm where coil camber is unknown
  • Coil-end handling agreed before a mixed-width plan is adopted

Then check the coil handling side. A width change means resetting the guides, the edge trim and often the roll pressure, which is 15 to 25 minutes on a line with a powered width adjustment.

Run the plan for a quarter before committing to a mill width. A 1,250 mm master that fits three parts in January often fits two by June, once the product mix moves.

How much edge trim does a 1,250 mm slitter need per side?

10 mm minimum, 15 mm where coil camber is unknown. Below 10 mm the slitter burr lands inside the strip that reaches the die.

How many parts does a 5 t coil yield at a 420 mm pitch?

About 3,030 with three strips in parallel, from 425 m of strip. Two strips drop that to roughly 2,020 parts for the same coil cost.

At what yield gap does a mixed-width plan pay for its changeover?

Above 8 points of yield, and above 20 coils a week. Below that the coil-end stop costs more than the steel it saves.

Does a 1,219 mm master change the plan?

Yes. It removes the 12.6 mm trim option entirely and cuts the three-strip plan to 36 mm of trim, so the width plan has to be rebuilt.

What crown makes a width plan unsafe?

Above 1 percent of strip width, which is 12 micrometres on a 1,250 mm coil. Beyond that the gap change across the width shows in flatness.

The coil line guide library sets out the full specification chain, from coil capacity through mandrel, straightening and control.

Widths and thickness ranges for each frame size are listed in the equipment data library, which a die designer needs before the strip layout is frozen.

Where to go next

Width is the first number a nesting study produces and the last one a purchasing team questions. The rest of the specification chain sits one level up.

The overview pillar connects capacity, straightening, feeding and tooling into the order in which they constrain each other.

See how the four decisions connect